Torreyana Residential Development – Infrastructure design and detailing

SECTOR: Infrastructure
SECTOR: Infrastructure Design

Project Summary

JPP Consulting

Our team in Poole provided infrastructure design and detailing for this exciting development of forty-five dwellings comprising a mix of terraced, semi-detached and detached houses and bungalows, working alongside Williams Lester Architects.

Our design service encompassed the setting out for all buildings and external paved areas, road layout and construction details, including the Section 38 agreement adoption plans, permeable paving details and street lighting plans. Our team were also responsible for the main foul and surface water drainage design, encompassing the Section 104 agreement for sewers for adoption, and the private drainage for each plot.



Gallery

JPP Consulting

Browse the project images by clicking through the gallery below -



News Feed

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID
Contact Us   FacebookTwitterLinkedIn Grand Union Works
Whilton Locks
Daventry
Northamptonshire
NN11 2NH
Phone: 01604 781811
Email: Click to email

Unit B2A, Denbigh Business Centre
23 First Avenue
Denbigh, Milton Keynes
MK1 1DN
Phone: 01908 889433
Email: Click to email

Suite 8, Branksome Park House
Branksome Business Park
Bourne Valley Road
Poole, Dorset
BH12 1ED
Phone: 01202 540888
Email: Click to email

Unit 7
Orion Park
Orion Way
Kettering
Northamptonshire
NN15 6PP
Phone: 01536 737224
Email: Click to email