Sports Pitches and MUGA – Drainage requirements and transport impact

SECTOR: Leisure
SECTOR: Development Planning

Project Summary

JPP Consulting

Over the past five years, JPP’s Development Planning team have been working in conjunction with two of the UK’s leading artificial sports pitch developers on their Sports Pitches and MUGA (multi use games area).

Our expert professional advice centres at the planning stage of the sites development and preparation of evidenced-based technical reports on highways / transport and drainage.

Our dedicated and highly experienced planners and engineers have developed a deep expertise in drainage requirements for sports pitch design and, through an appreciation of the operational characteristics, are able to quantify, and where required, mitigate the transport impacts in the most sustainable and economic manner.

As advisors to the sports construction industry, and through our unrivalled experience, JPP are perfectly placed to provide expert assistance during the pre and post planning development stages.



Gallery

JPP Consulting

Browse the project images by clicking through the gallery below -



News Feed

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID
Contact Us   FacebookTwitterLinkedIn Grand Union Works
Whilton Locks
Daventry
Northamptonshire
NN11 2NH
Phone: 01604 781811
Email: Click to email

Unit B2A, Denbigh Business Centre
23 First Avenue
Denbigh, Milton Keynes
MK1 1DN
Phone: 01908 889433
Email: Click to email

Suite 8, Branksome Park House
Branksome Business Park
Bourne Valley Road
Poole, Dorset
BH12 1ED
Phone: 01202 540888
Email: Click to email

Unit 7
Orion Park
Orion Way
Kettering
Northamptonshire
NN15 6PP
Phone: 01536 737224
Email: Click to email