Combined Phase I And Phase II Ground Investigation

Residential Development – St Peter’s Road, Kings Lynn

JPP Geotechnical and Environmental Ltd were appointed to undertake a Phase I and Phase II geotechnical and geoenvironmental investigation. The site comprised a parcel of reclaimed land adjacent to the River Great Ouse. It was proposed to redevelop the site into a residential development with associated infrastructure.

Our Phase I desk study assessment identified two historical channel features on site and that the land had been infilled and reclaimed from salting’s. The site had subsequently been developed into a commercial depot, which had recently been demolished. A site-specific risk assessment of the potential sources of both onsite and off-site contamination was produced. This enabled a targeted scope of site investigation to be designed, to assess the identified contaminative and geotechnical risks.

The targeted ground investigation comprised cable percussive boreholes for pile design parameters, trial pitting to assess ground conditions in regard to both geotechnical design parameters and potential to encounter on site sources of contamination. In addition, a series of windowless sampler boreholes were drilled across the site to target potential sources of onsite contamination identified in the conceptual model and to allow for the installation of land gas and groundwater monitoring wells. A second phase of intrusive investigation comprising  plate bearing tests was undertaken to assess compressibility of the ground as part of a settlement assessment.

Trial Pitting Works for contamination and geotechnical assessment Cable Percussive Drilling for contamination and geotechnical assessment Windowless Sampling for contamination and geotechnical assessment

Following the intrusive investigation works, a range of soil and groundwater samples were tested for potential contamination. These were associated with the sites historical land use and included heavy metals, metalloids, PAHs, petroleum hydrocarbons, VOCs and asbestos.

During our monitoring visits, groundwater samples were collected for contamination testing and land gas monitoring was undertaken to ascertain the site-specific gas screening value for the site to help determine the need for any land gas precautionary measures in the new development.

Our detailed assessment of the site allowed the key risks associated with the site’s historical usage and underlying ground conditions to be identified at an early stage. The subsequent targeted ground investigation works enabled a more cost and time effective investigation of the site to be undertaken. This helped to reduce the risks to our client whilst delivering the work within the required timescales and budget.

Our interpretive assessment of the ground investigation findings enabled both remedial and geotechnical design recommendations to be provided, which were tailored to the development proposals.

 



Gallery

JPP Consulting

Browse the project images by clicking through the gallery below -



News Feed

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID
Contact Us   FacebookTwitterLinkedIn Grand Union Works
Whilton Locks
Daventry
Northamptonshire
NN11 2NH
Phone: 01604 781811
Email: Click to email

Unit B2A, Denbigh Business Centre
23 First Avenue
Denbigh, Milton Keynes
MK1 1DN
Phone: 01908 889433
Email: Click to email

Suite 8, Branksome Park House
Branksome Business Park
Bourne Valley Road
Poole, Dorset
BH12 1ED
Phone: 01202 540888
Email: Click to email

Unit 7
Orion Park
Orion Way
Kettering
Northamptonshire
NN15 6PP
Phone: 01536 737224
Email: Click to email