Cropredy Marina – Levels design and earthworks modelling

SECTOR: Infrastructure
SECTOR: Infrastructure Design

Project Summary

JPP Consulting

JPP assisted Greenfisher Contracting with the civil engineering design on their earthworks scheme to extend Cropredy Marina and add up to 100 new berths within a new basin created off the existing marina.

JPP’s works extended to:

  • Levels design and earthworks modelling for the new car park and access track
  • Investigation works to establish the outfall to an existing ditch crossing the proposed basin and a design for the ditch diversion and subsequent culvert around the basin
  • Managing the Section 23 application process with the LLFA up to approval


Gallery

JPP Consulting

Browse the project images by clicking through the gallery below -



News Feed

This message is only visible to admins.
Problem displaying Facebook posts.
Click to show error
Error: Server configuration issue Error: No posts available for this Facebook ID
Contact Us   FacebookTwitterLinkedIn Grand Union Works
Whilton Locks
Daventry
Northamptonshire
NN11 2NH
Phone: 01604 781811
Email: Click to email

Unit B2A, Denbigh Business Centre
23 First Avenue
Denbigh, Milton Keynes
MK1 1DN
Phone: 01908 889433
Email: Click to email

Suite 8, Branksome Park House
Branksome Business Park
Bourne Valley Road
Poole, Dorset
BH12 1ED
Phone: 01202 540888
Email: Click to email

Unit 7
Orion Park
Orion Way
Kettering
Northamptonshire
NN15 6PP
Phone: 01536 737224
Email: Click to email